TM 9-2320-363-10
2-28.
OPERATE WINCH (M916A1 AND M916A2) (Cont).
(2)
member disconnect
from anchor (2).
Have
a
crew
wire rope eye (1)
(3)
To pay out wire rope, pull up and hold line control lever (4) in
LINE OUT position. Winch unwinds in low speed. Have crew member walk end of
wire rope out.
NOTE
High-speed winch operation is only recommended for
paying out wire rope or taking up slack.
(4)
To run winch at high speed, set throttle control (5) to HIGH
and push down and hold speed control lever (3).
(5)
When desired amount of line has been payed out,
by releasing both control levers. Set throttle control (5) to LOW.
stop winch
2-112