TM 9-2320-273-20
EXTERIOR LIGHTING.
5-47. CLEARANCE LAMPS MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a. Removal.
(2)
b. Installation.
(2)
c. Operational Check.
(1)
5 Minutes Total.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
All.
None.
None.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
None.
PERSONNEL REQUIRED
One (MOS-63B20).
REFERENCES (TM)
TM 9-2320-273-10.
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Parked on Level Ground.
GENERAL SAFETY INSTRUCTIONS
Engine OFF.
Transmission in Neutral.
Park Brake Set.
TROUBLESHOOTING REFERENCES
Table 5-9.
5-156