TM 9-2320-273-20
ETHER QUICK-START MAINTENANCE.
4-33. ETHER TUBE MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a. Removal.
(10)
b. Inspection.
( 5)
c. Installation.
(10)
d. Operational Check.
( 5)
30 Minutes Total.
INITIAL SETUP
APPLICABLE CONFIGURATIONS
All.
TEST EQUIPMENT
EQUIPMENT CONDITION
PARAGRAPH
CONDITION DESCRIPTION
None.
None.
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
Liquid Teflon (Refer to Appendix C).
PERSONNEL REQUIRED
SPECIAL ENVIRONMENTAL CONDITIONS
Two (MOS-63B20).
Coolant Temperature Must be Below 50°F
(2nd Mechanic Operates Cab
or Ether Solenoid Valve Will Not Function.
Controls in Part D.)
Work in a Well Ventilated Area Away From Sparks or Flame.
REFERENCES (TM)
Vehicle Parked on Level Ground.
None.
GENERAL SAFETY INSTRUCTIONS
Ether is Highly Explosive. Be Alert for the Strong Odor of
Spilled Ether. Guard Against Flame or Sparks in Work Area.
Engine OFF.
Transmission in Neutral.
TROUBLESHOOTING REFERENCES
Park Brake Set.
Table 5-3.
4-112