TM 9-2320-273-20
FUEL AND AIR INTAKE SYSTEM.
4-22. HAND THROTTLE LINKAGE MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a.. Removal.
(20)
b. Cleaning and lnspection.( 5)
c. Installation.
(30)
d. Checking Idle Speed.
( 2)
57 Minutes Total.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
All.
None.
None.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
None.
PERSONNEL REQUIRED
One (MOS-63B20).
REFERENCES (TM)
TM 9-2320-273-10.
TROUBLESHOOTING REFERENCES
Table 4-1.
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle on Level Ground.
GENERAL SAFETY INSTRUCTIONS
Engine Off; Transmission in Neutral.
Park Brake Set.
4-64