TM 9-2320-273-20
FUEL AND AIR INTAKE SYSTEM.
4-22. HAND THROTTLE LINKAGE MAINTENANCE (Continued).
LOCATION/lTEM
ACTION
REMARKS
A. REMOVAL (Continued).
5. Locknut (11) and starwasher
(10).
6. Hand throttle cable (3).
7. Locknut (2).
B. CLEANING AND INSPECTION.
8. Hand throttle cable (3).
C. INSTALLATION.
9.
10.
11.
12.
13.
14.
15.
16.
Locknut (2).
Hand throttle cable (3).
Locknut (11) and starwasher
( 1 0
Hand throttle cable (3).
Heater control panel (13).
Two locknuts (8) and
washers (9).
Setscrew (6).
Throttle knob (1).
Unscrew and remove from
hand throttle cable (3).
PuII from firewalI and heater
control panel (13).
Unscrew and remove from
hand throttle cable (3).
Wipe clean and inspect for:
a.Kinked
cable.
b. Cable end crossed or
burred threads.
Screw onto hand throttle
cable (3).
Install thru front of heater
control panel (13).
Screw onto hand throttle
cable (3).
Insert end thru firewall
and bracket.
a.
b.
a.
b.
Install back of panel.
Install two screws (12)
and tighten.
Install and tighten.
It may be necessary to
either loosen or tighten
the locknut (8) on the
outer bracket face.
Install and tighten to lock
cable wire (7).
Remove and lubricate hand
throttle cable (3) per LO 9-
2320-273-12.
Replace as necessary.
4-66