TM 9-2320-273-20
STEERING MECHANISM.
10-20. TIE ROD MAINTENANCE (Continued).
LOCATION/lTEM
ACTION
REMARKS
C. INSTALLATION (Continued).
10. Two nuts (1).
a. Torque to 110-125 Ib-ft
(149-169 Nm).
b. Secure with new cotter key
(2) at each end.
NOTE
Follow-on maintenance action required:
Check wheel alinement; refer to paragraph
10-10A. Install front fenders; refer to
paragraph 11-14 B or D.
10-81