TB 9-2320-360-13&P-2
CENTER BLAST DEFLECTOR REPLACEMENT - CONTINUED
0032 00
REMOVAL - CONTINUED
4.
Remove six locknuts (17) and washers (18) from center blast deflector (4). Discard locknuts.
5.
Remove 14 locknuts (10), washers (11), and washers (12) from center blast deflector (4). Discard locknuts.
6.
Remove locknut (15) and washer (16) from center blast deflector (4). Discard locknut.
7.
Remove four locknuts (13) and washers (14) from center blast deflector (4). Discard locknuts.
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death to per-
sonnel.
NOTE
Center blast deflector weighs 392 lb (178 kg).
8.
Using lifting device, remove center blast deflector (4) from vehicle.
10,11,12
4
17,18
15,16
13,14
417-115
CLEANING AND INSPECTION
Clean and inspect all parts IAW General Maintenance Instructions (WP 0011 00).
0032 00-3