• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5-116. Insulation Installation - Final View.
Figure 5-120. Insulation Installation - Roof Insulation (4 of 7).

Crew Protection Kit For M915A3P1,M915A2P1, M916A3P1, M917A2P1, M915A4P1, M917A1P1, M916A1P1, And M916A2P1 - 1 Page Navigation
  242    243    244    245    246  247  248    249    250    251    252  
img
. . .
Freightliner M915 / M916 -
Installation Manual P/N 0257550622-00
Crew Protection Kit
(Doc No.: II113500-1 D)
Fasteners:
Find No.
(Table 6.2)
Part No.
Description
Size
Quantity
None
Special Tools/ Materials
Description:
Vendor/Part-Number:
None
5.22.2 Installation Instructions
1. Prepare all surfaces to receive the foam insulation panels by cleaning the surfaces with a
mild detergent. Allow them to dry before installing the foam.
2. Installation order is not critical.
3. Select a piece of foam insulation. Peel the plastic backing from the foam adhesive side.
Align the foam with the surface to be covered. Place one edge of the foam on the surface
to be covered and apply pressure, working across the foam in a continuous direction to
minimize wrinkles and air entrapment.
4. Repeat for each part.
Figure 5-119. Insulation Installation -
Figure 5-118. Insulation Installation -
Backside Insulation (3 of 7).
LH Side Wall Insulation (2 of 7).
Page 95 of 125


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.