• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HEAVY-DUTY WINCH REMOVAL/INSTALLATION - Continued
CHAPTER 6. PARTS INFORMATION

Truck, Tractor, Light Equipment Transporter, 8X8 M983A2 Let Page Navigation
  504    505    506    507    508  509  510    511    512    513    514  
img
. .
TB 9-2320-279-13&P-4
0076
2
1
Figure 14.
END OF TASK
FOLLOW-ON MAINTENANCE
1. Check hydraulic fluid level (refer to TM 9-2320-315-14&P).
2. Start engine and build air pressure to 120 to 125 psi (827 to 862 kPa) (refer to TM 9-2320-279-10).
3. Check hydraulic system for leaks (refer to TM 9-2320-315-14&P).
4. Check air system for leaks (refer to TM 9-2320-315-14&P).
5. Check operation of heavy-duty winch. (WP 0015)
6. Shut OFF engine (refer to TM 9-2320-279-10).
7. Remove wheel chocks (refer to TM 9-2320-279-10).
END OF WORK PACKAGE
0076-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.