TM 9-2320-363-34-2
Section VI. TOP PLATE REPLACEMENT
OVERVIEW
This section illustrates and describes procedures for removal, cleaning, inspection, and installation of the
top plate.
TOP PLATE REPLACEMENT
This task covers:
a. Removal b. Cleaning c. Inspection d. Installation
INITIAL SETUP
Applicable Configuration:
M916A1 and M916A2
Tools and Special Equipment:
Tool Kit, SC 5180-90-CL-N05
Materials/Parts:
Compound,
Antiseize
Appendix B, Item 11
References:
TM 9-2320-363-10
Equipment Condition:
Reference
TM 9-2320-363-10
Condition Description
Travel Locks in Unlock
Position
General Safety Instructions:
WARNING
Top plate weighs 700 lb (318
kg). Use hoist with lifting
capacity of 900 lb (409 kg) to
remove or install top plate.
Failure to do so could result in
injury to personnel.
20-30 Change 1