TM 9-2320-302-34
0071 00-14
TRANSMISSION OVERHAUL - CONTINUED
0071 00
MODULE OVERHAUL - CONTINUED
Torque Converter Module Assembly - Continued
NOTE
Perform steps 22 through 27 to determine torque converter selective shim dimensions.
22.
Using a depth micrometer, measure from top of torque converter drive tang surface to thrust surface of turbine hub. This
dimension is A.
23.
Remove bolt from tool (J38548). Install tool into torque converter and position converter on work surface so converter is
supported by tool.
24.
Using a depth micrometer, measure from top of torque converter drive tang surface to thrust surface of turbine hub. This
dimension is B.
25.
Subtract dimension B from dimension A to get dimension C.
26.
Dimension C should be 0.0060-0.0139 in (0.153-0.353 mm). If dimension is not correct, a shim is required. If the
dimension is correct, proceed to step 29.
27.
If a shim is required, select appropriate shim from list below:
28.
Disassemble torque converter and install selected shim. Repeat step 22 through 27 to confirm dimension C.
29.
Install remaining 32 nuts (2) and tighten to 22-26 lb-ft (30-35 Nm).
DIMENSION C
USE P/N
SHIM THICKNESS
0.0140-0.0229 inch (0.356-0.581 mm)
29503879
0.009-0.011 inch (0.23-0.27 mm)
0.0230-0.0319 inch (0.585-0.810 mm)
29503880
0.018-0.020 inch (0.46-0.50 mm)
0.0320-0.0394 inch (0.813-1.000 mm)
29503881
0.027-0.029 inch (0.69-0.73 mm)
THRUST
SURFACE
OF TURBINE
HUB
DRIVE TANG
SURFACE
SHIM LOCATION
DRIVE TANG
SURFACE
THRUST
SURFACE
OF
TURBINE
HUB
J 38548