TM 9-2320-273-20
PROPELLER SHAFTS AND UNIVERSAL JOINTS.
8-11. PROPELLER SHAFTS AND UNIVERSAL JOINTS MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a. Removal.
(25)
b. Cleaning and Lubrication.
(10)
c. Inspection of Universals.
(10)
d. Installation.
(25)
e. Checking for Vibration.
(15)
85 Minutes Total .
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
All.
None.
None.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
GAA (Refer to Appendix C).
Blocks.
Nonflammable Cleaning Solvent SD-2 (Refer to Appendix C).
PERSONNEL REQUIRED
One (MOS63B20).
REFERENCES (TM)
TM 9-2320-273-10.
LO 9-2320-273-12.
TM 9-2320-273-20P.
TROUBLESHOOTING REFERENCES
Table 8-1, 8-2.
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Parked on Level Ground.
GENERAL SAFETY INSTRUCTIONS
Engine OFF.
Transmission in Neutral.
Park Brake Set.
8-12