TM 9-2320-273-20
TRANSMISSION.
6-11.
PNEUMATIC CONTROL LINE MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a. Removal.
(15)
b. Inspection.
( 5 )
c. Installation.
(15)
d. Checking for Leaks. (25)
60 Minutes Total.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
All.
9-13A.
Air Reservoirs Drained.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
Soap Solution.
Gaskets (Two), 9N4010 (11083).
PERSONNEL REQUIRED
One (MOS-63B20)
REFERENCES (TM)
TM 9-2320-273-10.
TM 9-2320-273-20P.
TROUBLESHOOTING REFERENCES
Table 9-1.
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Parked on Level Ground.
GENERAL SAFETY INSTRUCTIONS
Engine Off.
Transmission in Neutral.
Park Brake Set.
6-20