TM 9-2320-273-20
SENDING UNITS, SWITCHING DEVICES, AND WINTERIZATION KIT.
5-91. WINTERIZATION KIT BATTERY BOX HEATER MAINTENANCE (Continued).
LOCATION/lTEM
ACTION
REMARKS
A. REMOVAL (Continued).
5. Insulation (12) and bottom
a. Remove.
cover (13).
b. Clean surface with Milsolv
(18).
B. INSTALLATION
6. Insulation (12) and bottom
a. Apply adhesive (22) to
Adhesive (22) supplied
cover (13).
bottom cover (13).
with kit.
7. Insulation (19) and cover (17).
a. Install insulation (19)
in place.
b. Install cover (17).
8. Four seals (20) and (21).
a. Apply adhesive (22) to
seals.
b. Stick in place.
9. Heater (3) and loom (6).
a. Install four brackets (9)
and tube clips (4).
b. Secure with four screws
Do not tighten nuts (11)
(5), Iockwashers (10),
at this time.
and nuts (11).
c. Position heater (3) and
loom (6) on bottom cover
(13) and aline four mount-
ing holes.
d. Install four capscrews (14),
washers (8) and nuts (7)
and tighten.
e. Tighten four nuts (11),
Iockwashers (10) and
screws (5).
10. Cover assembly (1).
Install to bottom of battery
Position loom (6) so it is
box.
accessible after installa-
tion of cover assembly (1).
11. Two terminals (2).
Connect to terminal strip.
Refer to para 5-92.
5-342