TM 9-2320-273-20
5-29. SENDING UNITS, SWITCHlNG DEVICES AND WINTERIZATION KlT MAlNTENANCE
TASK SUMMARY (Continued).
LIST OF TASKS
TASK
NO.
3.
4.
5.
6.
7.
8.
9.
TASK
Water Temperature Sending Unit Maintenance:
A.
Removal.
B.
Installation.
C. Operational Check.
Water Temperature Switch Maintenance:
A.
Removal.
B.
Installation.
C.
Operational Check.
Ether Temperature Switch Maintenance:
A.
Removal.
B.
Installation.
C. Operational Check.
Neutral Safety Switch Maintenance:
A.
Removal.
B.
Installation.
C.
Operational Check.
Transmission Oil Temperature Sending Unit
Maintenance:
A.
Removal.
B.
Installation.
C.
Operational Check.
Backup Switch and Clutch Disengagement Sensor
Maintenance:
A.
Removal.
B.
Installation.
C.
Operational Check.
Backup Alarm Maintenance:
A.
Removal.
B.
Installation.
C.
Operational Check.
TASK
REF
5-72
5-72A
5-72B
5-72C
5-73
5-73A
5-73B
5-73C
5-74
5-74A
5-74B
5-74C
5-75
5-75A
5-75B
5-75C
5-76
5-76A
5-76B
5-76C
5-77
5-77A
5-77B
5-77C
5-78
5-78A
5-78B
5-78C
TROUBLESHOOTING
REF (TABLE)
5-7
5-7
5-3
6-1
5-7
5-12
5-6
5-81