TM 9-2320-273-20
5-27. PANEL-MOUNTED INSTRUMENTS MAINTENANCE TASK SUMMARY (Continued).
LIST OF TASKS
TASK
TASK
TROUBLESHOOTING
NO.
TASK
REF
REF (TABLE)
3.
Low Air Pressure Indicator Lamp Maintenance:
5-61
5-6
A.
Removal.
5-61A
B.
Installation.
5-61B
C.
Operational Check.
5-61C
4.
Electrical Switches Maintenance (R H Cluster):
5-62
5-6
A.
Removal.
5-62A
B.
Installation.
5-62B
C. Operational check.
5-62C
5.
Indicator Lamps Maintenance (R H Cluster):
5-63
5-7
A.
Removal.
5-63A
B.
Installation.
5-63B
C. Operational Check.
5-63C
6.
Clearance Lamps Switch Maintenance
5-64
5-9
A.
Removal.
5-64A
B.
Installation.
5-64B
C. Operational Check.
5-64C
7.
Clearance Indicator Lamp Maintenance:
5-65
5-9
A.
Removal.
5-65A
B.
Installation.
5-65B
C. Operational Check.
5-65C
8.
Tachograph Maintenance:
5-66
5-7
A.
Reading Tachograph Disk.
5-66A
B.
Disk Pack Removal.
5-66B
C.
Disk Pack Installation.
5-66C
D.
Tachograph Removal.
5-66D
E.
Tachograph Installation.
5-66E
F.
Operational Check.
5-66F
5-77