TM 9-2320-273-20
BRAKE SYSTEM.
1.29. DOUBLE-CHECK AND STOPLAMP VALVE MAINTENANCE (M915, M916, M917C M920)
rHls TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
Removal.
(15)
Installation.
(15)
Operational Check.
(10)
40 Minutes Total.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
M915, M916, M917, M920.
9-13A.
Secondary Air
TEST EQUIPMENT
Reservoirs Drained.
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
Liquid Teflon (refer to appendix C).
PERSONNEL REQUIRED
TWO (MOS-63B20).
REFERENCES (TM)
TM 9-2320-273-10.
TM 9-2320-273-20P.
TROUBLESHOOTING REFERENCES
Table 9-1.
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Parked on Level Ground.
GENERAL SAFETY lNSTRUCTIONS
Engine OFF.
Transmission in Neutral.
Park Brake Set.
9-110