• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CAMSHAFT INSTALLATION.
FIGURE 8-5. CHECKING FOR OUT-OF-ROUNDNESS.

Maintenance Manual For Trailer, Flatbed, 15 Ton Payload Multi Axle
Page Navigation
  30    31    32    33    34  35  36    37    38    39    40  
img
FIGURE 8-2. FOUNDATION BRAKE COMPONENTS.
R e p l a c e cracked, badly scored, or severly
d.
heat checked brake drums.
8-17. REFINISHING DRUMS.
a. Do not exceed maximum inside drum diameter
specification cast into brake drum.
b. Refinish both drums on an axle at the same
time.
FIGURE 8-3. CHECKING FOR SCORED DRUM.
c. Use a finish of 180 micro-inches
roughness.
c.
Use  new  anchor  pin  bushings,
8 - 1 8 . CHECKING BRAKE PARTS.
cam  rollers,  roller  shafts  and  lin-
ing
rivets
a. Check brake shoe against anew shoe (if pos-
Do not use distorted shoes.
sible) for distortion.
d. Examine the cam face, cam washers, anchor
pins, clips and snap rings for wear, breakage, and
b. Check retract spring for elongation.
distortion.
8-3.


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.