TB 9-2320-335-13&P
8-20.1. STEERING GEAR, CENTER LINK, AND PITMAN ARM REPLACEMENT
(SERIAL NUMBERS 246890 AND ABOVE) (Cont'd)
7.
Apply sealing compound to three capscrews (12).
8.
Install steering gear (14) on frame (13) with three washers (10), lockwashers (11), bracket (9), and
capscrews (12). Tighten capscrews (12) to 160195 lb-ft (217264 Nm).
9.
Install idler arm (21) on frame (20) with two washers (22), capscrews (23), washers (18), and
locknuts (19). Tighten capscrews (23) to 85 lb-ft (115 Nm).
10.
Install two tie rods (26) on center link (17) with two slotted nuts (25). Tighten slotted nuts (25) to
70 lb-ft (95 Nm).
11.
Install two cotter pins (24) on slotted nuts (25).
12.
Align hole in yoke (16) with notch on steering gear splines (15) and slide lower steering shaft (3) on
steering gear splines (15).
13.
Install lower steering shaft (3) on steering gear (14) with washer (4), capscrew (6), washer (2), and
lower steering shaft locknut (1). Tighten locknut (1) to 4050 lb-ft (5468 Nm).
14.
Install two power steering lines adapters (7) on steering gear (14).
15.
Install two power steering lines (5) and O-rings (8) on two adapters (8).
5
3
9
4
6
2
1
10
7
11
8
7
8
12
16
14
15
13
8-20