TB 9-2320-302-13&P-2
ROOF ARMOR REPLACEMENT - CONTINUED
0031 00
INSTALLATION - CONTINUED
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during
procedure. Failure to follow this warning may cause injury or death to personnel.
For proper threat protection, armor must be installed correctly into the armor frame. During installation,
ensure that the surface marked "STRIKE FACE" is facing outward towards the threat. Exposing the
passive side of the ballistic panel outward makes the armor less effective. Failure to follow this warning
may cause injury or death to personnel.
6.
With assistance, install right roof panel (13) on roof frame (12).
7.
With assistance, install left roof panel (7) on roof frame (12).
8.
With assistance, install middle roof panel (2) and two dividers (1) on roof frame (12).
9.
Install rear roof bracket (8), eight washers (11), new lockwashers (10), and nuts (9) on middle roof panel (2).
10.
Install two roof grab straps (6), four washers (5), new lockwashers (4), and nuts (3) on middle roof panel (2).
1
1
2
3,4,5
3,4,5
6
6
7
13
440-047
12
8
9,10,11
END OF WORK PACKAGE
0031 00-7/(0031 00-8 Blank)