• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FOAM INSULATION REPLACEMENT - CONTINUED
FOAM INSULATION REPLACEMENT - CONTINUED

Crew Protection Kit For M915A3P1,M915A2P1, M916A3P1, M917A2P1, M915A4P1, M917A1P1, M916A1P1, And M916A2P1 - 1 Page Navigation
  122    123    124    125    126  127  128    129    130    131    132  
img
TB 9-2320-302-13&P-1
FOAM INSULATION REPLACEMENT - CONTINUED
0030 00
REMOVAL - CONTINUED
3.
Remove foam insulation panel (5) from left rear B-pil-
5
lar armor (6).
6
4.
Remove foam insulation panel (7) from left side armor
7
(8).
8
5.
Remove two foam insulation panels (9) from left A-
pillar armor (10).
9
10
417-194
0030 00-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.