TM 9-2320-363-34-1
NOTE
Procedure is the same for both tie rods.
INSTALL TIE ROD (1), CASTELLATED NUT (2), AND NEW COTTER PIN (3). TIGHTEN
CASTELLATED NUT TO 165-180 LB-FT (224-244 N.m).
NOTE
Follow-on Maintenance:
Check front axle toe-in alinement (TM 9-2320-363-20).
5-55