TB 9-2320-360-13&P-1
A/C CONDENSER SUBSYSTEM REPLACEMENT - CONTINUED
0035 00
INSTALLATION - CONTINUED
11.
Open four shutoff valves (3, 4, 15, and 16).
12.
Install four caps (1, 2, 13, and 14) to four shutoff valves (3, 4, 15, and (16).
HETF00411
13.
Perform leak test inspection (WP 0038 00).
14.
Install right fender (TM 9-2320-360-20-2).
15.
Close hood (TM 9-2320-360-10).
16.
Remove wheel chocks (TM 9-2320-360-10).
END OF WORK PACKAGE
0035 00-6