TM 9-2320-302-34
0054 00-8
STARTER REPAIR - CONTINUED
0054 00
ASSEMBLY - CONTINUED
10.
If removed, install six new plugs (43), new felt wick (42), new plug (41), and new bushing (40) in nose housing (36).
NOTE
Install nose housing as noted in disassembly sequence.
11.
Install washer (38), packing (37), nose housing (36), and six screws (35) on shift housing (39).
12.
If removed, install new bushing (34) in commutator housing (10).
13.
Install felt wick (33), pipe plug (32), and new packing (31) in commutator housing (10).
14.
If removed, install new bushing (30) in commutator housing (10).
15.
Install washer (29), insulation washer (28), and new packing (27) on ground stud (26).
16.
Install ground stud (26) in commutator housing (10).
17.
Install new packing (25), insulator (24), four washers (23), and nut (22) on ground stud (26).
18.
Install ground jumper (21), four insulation washers (20), and brush holders (19) in commutator housing (10).
19.
Install four insulation bushings (18), eight insulation washers (17), four washers (16), new lock washers (15), and
screws (14).
20.
Install insulation washer (11), washer (12), and commutator housing (10) in field ring (13).
21.
Apply silicone adhesive to threads of four screws (8) and install four new lock washers (9) and screws (8).
39
36
35
40
41
42
43
36
38
37