TM 9-2320-283-20-3
SPRING, SHOCK ABSORBERS, AND TORQUE RODS.
3-251. TORQUE RODS REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
6. All metal parts.
Clean and inspect.
Refer to paragraphs 3-4
and 3-5.
NOTE
.If installing rear torque rod only, do
step 7 and skip step 8.
.If installing forward torque rod, skip
step 7 and go to step 8.
.If installing both torque rods, do
both steps 7 and 8.
7. Rear torque rod
assembly (3).
a. Line up holes in item (3)
with holes in item (1).
b. Secure together but do not
tighten with two items
(l0), (7), and (2).
8. Forward torque rod
assembly (11).
a. Line up holes in item (11)
with holes in item (9).
b. Secure together but do not
tighten with two items
(l0), (7), and (2).
9. Torque rod assem-
blies (3) and (11).
a. Line up holes in items (3)
and (11) with holes in
item (4) and (6).
b. Secure together but do not
tighten with two items
(8), (7), and (2).
3-1488