TM 9-2320-283-20-3
STEERING SYSTEM.
3-216. VERTICAL LINK REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
C. INSTALLATION (Continued).
8. Two new pins (6).
Install into items (2) and
(4),
It may be necessary to
and bend ends over.
tighten two items (2)
further in order to
aline slots of items (2)
with holes of item (4).
9. Two fittings (3).
Using grease gun, lubricate
Refer to LO 9-2320-283-
with grease.
12.
NOTE
Follow-on maintenance action required:
None.
3-1296