TM 9-2320-273-20
COMPRESSED AIR SYSTEM.
9-14. SAFETY RELEASE VALVE MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a. Removal.
( 2)
b. Testing.
(10)
c.
Installation.
( 3)
d. Operational Check
( 5)
20 Minutes Total.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
All.
9-13A.
Air Reservoirs Drained.
TEST EQUIPMENT
(M915 Primary
M916 Thru M920-
None.
Secondary).
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
Liquid Teflon (Refer to Appendix C).
Soap Solution.
Controllable Shop Air Supply.
Air Pressure Gage.
PERSONNEL REQUIRED
One (MOS-63B20).
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Parked on Level Ground.
REFERENCES (TM)
GENERAL SAFETY INSTRUCTIONS
TM 9-2320-273-10.
TM 9-2320-273-20P.
Engine OFF.
Transmission in Neutral.
Park Brake Set.
TROUBLESHOOTING REFERENCES
Table 9-1.
9-42