TM 9-2320-273-20
PROPELLER SHAFTS AND UNIVERSAL JOINTS.
8-11. PROPELLER SHAFTS AND UNIVERSAL JOINTS MAINTENANCE (Continued).
LOCATION/lTEM
ACTION
REMARKS
D. INSTALLATION.
STYLE A
18. Yoke (6) and cross (5).
19. Two bearing cups (3).
20. Two Iockplates (2).
21. Yoke (6) and cross (4).
22. Two bearing cups (3).
23. Two Iockplates (2).
STYLE B
24. Universal joint (9).
25. Universal joint (9)
attached to shaft
flange.
Install cross in one yoke.
Press into yoke to secure cross.
a. Install one on each bearing cup.
b. Attach with capscrews (1).
Install other yoke.
Press into yoke to secure cross.
a. Install one on each bearing cup.
b. Attach with capscrews (1).
c. Bend up tabs on Iockplates (2).
Aline mounting holes to propeller
shaft flange, install hexhead bolts
(11) and Iockwashers (12). Tighten
to 100-110 Ib-ft (136-149 Nm).
Raise into alinement with yoke
mounting holes, install hexhead
bolts (11) and Iockwashers (12).
Tighten to 100-110 Ib-ft (136-
149 Nm). Install locknuts (13),
if so equipped.
NOTE
Follow-on maintenance required:
Lubricate all grease fittings (5),
(10), and (14) (see LO 9-2320-
273-12).
8-20