TM 9-2320-273-20
SENDING UNITS, SWITCHING DEVICES, AND WINTERIZATION KIT.
5-74. ETHER TEMPERATURE SWITCH MAINTENANCE (Continued).
LOCATION/lTEM
ACTION
REMARKS
B. INSTALLATION.
3. Ether temperature
switch (2).
4. Wire connector (1).
Coat threads with liquid
teflon. Install and tighten.
Reconnect.
C. OPERATIONAL CHECK.
NOTE
Follow-on maintenance required:
Fill radiator per paragraph 4-42.
5. Engine.
Start using cold start procedure
(refer to TM 9-2320-273-10).
5-268