TM 9-2320-273-20
SENDING UNITS, SWITCHING DEVICES, AND WINTERIZATION KIT.
5-71. OIL PRESSURE SWITCH MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a. Removal.
( 5)
c. Operational Check. ( 1)
b. Installation. ( 5)
11 Minutes Total.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
All.
None.
None.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
Liquid Teflon (Refer to Appendix C).
PERSONNEL REQUIRED
One (MOS-63B20).
REFERENCES (TM)
TM 92320273-10.
TM 92320273-20P.
TROUBLESHOOTING REFERENCES
Table 5-6.
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Parked on Level Ground.
GENERAL SAFETY INSTRUCTIONS
Engine OFF.
Transmission In Neutral.
Park Brake Set.
5-254