TM 9-2320-273-20
5-3
4-10. ETHER QUICK-START SYSTEM MAINTENANCE TASK SUMMARY (Continued).
LIST OF TASKS
TASK
TASK
TROUBLESHOOTING
NO.
TASK
REF
REF (TABLE)
3.
Atomizer Maintenance:
4-32
5-3
A.
Removal.
4-32A
B.
Installation and operational check.
4-32B
4.
Ether Tube Maintenance:
4-33
A.
Removal.
4-33A
B.
Inspection.
4-33B
C.
Installation,
4-33C
D. Operational check.
4-33D
4-15