TM 9-2320-273-20
FRAME.
11-10. PINTLE MAINTENANCE (M915 THRU M917 AND M920).
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a. Removal.
(15)
b. Cleaning and Inspection.
(15)
c. Installation.
(20)
d. Lubrication and Adjustment.
(15)
65 Minutes Total.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
M915 Thru M917 and M920.
None.
None.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
Lithium (Chassis) Grease (Refer to Appendix C).
Cotter Pin, 773 (74410).
PERSONNEL REQUIRED
One (MOS-63B20).
REFERENCES (TM)
TM 9-2320-273-10.
TM 9-2320-273-20P.
LO 9-2320-273-12.
TROUBLESHOOTING REFERENCES
Table 11-1.
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Parked on Level Ground.
GENERAL SAFETY INSTRUCTIONS
Engine OFF.
Transmission in Neutral.
Park Brake Set.
11-16