TB 9-2320-302-13&P-3
MAINTENANCE ALLOCATION CHART (MAC) - CONTINUED
0024 00
Table 2. Tools and Test Equipment Requirements for the Air Conditioning Kit.
0(5)
0(3)
0(4)
0(2)
0(1)
PART NUMBER/
NATIONAL
MAINTENANCE
ITEM
CAGEC
STOCK NUMBER
ITEM NAME
LEVEL
NO.
1 Clamp, C: 10 In. Size
1 5120-00-203-6432 1
5120-00-203-6432
1
O
(08292)
1
2
O
2 Dispenser, Sealant
2 5120-00-679-5655 2
101 (06798)
2
3
O
3 Drill Set, Twist:
3 5133-00-596-8088 3
B94.11M (05047)
3
33/64 to 3/4 In. in 1/64 In. Increments
3
4
O
4 Link, Bearing (Lifting)
4 5120-01-451-1401 4
1387575 (11083)
4
5
F
5 Reclaimer, Refrigerant
5 4250-01-359-0393 5
SS90-R134-50/60
5
6
O
6 Shop Equipment, Automotive Maintenance 4910-00-754-0654 6
SC 4910-95CLA74
and Repair: Organizational Maintenance,
(19204)
6
6
Common No. 1, Less Power
ShopEquipment,CommonNo.1
6
7
O
7 Shop Set, Welding
7
4940-00348-7596 7
SC3470-95CLA11
Field Maintenance Post, Camp and Station,
(19204)
7
Set B
7
8
O
8 Sling, Nylon
8 2835-01-078-2081 8
4-8FTX2IN (91796) 8
9
O
9 Tool Kit, General Mechanic's
9 5180-01-454-3787 9
12B470000 (59678)
9
Automotive
9
10
F
10 Tool Kit, Refrigeration Equipment
10 5180-00-596-1474 10 SC 5180-90-CL-N18 10
(available in SC 5180-95-N18)
10
11
O
11 Wrench Set, Torx
11 5120-01-529-2707 11
05253
11
Table 3. Remarks for the Air Conditioning Kit.
(1)
(2)
REMARKS
CODE
REMARKS
A
Refer to Operator PMCS.
B
Service by cleaning ballistic glass.
C
Limited Repair Authorized.
END OF WORK PACKAGE
0024 00-2