PRE - INSTALLATION INSTRUCTION - Continued
REQUIRED TOOLS

Crew Protection Kit For M915A3P1, M915A2P1, M916A3P1, M917A2P1, M915A401, M917A1P1, M916A1P1, And M916A2P1 - 2 Page Navigation
  169    170    171    172    173  174  175    176    177    178    179  
img
TB 9-2320-302-13&P-2
SAFETY
Be
sure to power-off and secure all power sources of the vehicle. At no
time should any power be left on in the vehicle. Make sure all communi-
cation and electrical equipment is powered off.
Remove
negative battery terminal before installation.
You
must inspect the vehicle before installation for flammable material
to avoid risk of fire. Inspect for oily or wet substances that may be flam-
mable.
Installation
should be done in an area reasonably clean and free of
flammables. Be sure to avoid installing above an oily floor.
This
installation is best done in a spacious environment. Materials will
be placed along each side of the vehicle prior to the installation. There
is a risk of a trip hazard if the space is too confined.
Use
protective eyewear.
To
avoid injury while lifting some of the bulkier items, it is suggested to
use 2 or more individuals.
Bolts
attached to armor should be inspected and tightened every 3,000
miles.
Torque
until flat washers are compressed. DO NOT OVERTIGHTEN.
ArmorWorks
0038 00-8