TB 9-2320-302-13&P-2
UNDERBODY MINE BLAST PANEL REPLACEMENT - CONTINUED
0017 00
INSTALLATION - CONTINUED
N OT E
Assistance is required to hold up mine blast mounting brackets underneath cab as mounting hardware is installed.
6.
With assistance, install three right-hand mine blast mounting brackets (20), six new lockwashers (19), washers (18), and
bolts (17) on underside of cab assembly (4).
17,18,19
4
440-018
20
0017 00-13