• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PRIMARY PUMP PIPING INSTALLATION
TANK VENT DRAIN INSTALLATION

Hemtt Tanker Armor Module Kit 5Sk319 Kit, Armor, Tan 5Sk320 Kit, Armor, Green Page Navigation
  318    319    320    321    322  323  324    325    326    327    328  
img
TB 9-2320-279-13&P
0040
Position coupling gasket (26) over ends of discharge elbow (12) and discharge pipe (27).
Install two coupling halves (32) on coupling gasket (26) with two screws (33) and nuts (34).
Inspect primary pump for leaks.
0040-110


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.