• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Two-Level Maintenance Allocation Chart for M978 Tanker Armor Module Kit
Table 2. Tools and Test Equipment for M978 Tanker Armor Module Kit.

Hemtt Tanker Armor Module Kit 5Sk319 Kit, Armor, Tan 5Sk320 Kit, Armor, Green Page Navigation
  152    153    154    155    156  157  158    159    160    161    162  
img
TB 9-2320-279-13&P-3
0034
Table 1. Two-Level Maintenance Allocation Chart for M978 Tanker Armor Module Kit. (Continued)
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
FIELD
SUSTAINMENT
UNIT
DS
GS
DEPOT
TOOLS AND
GROUP  COMPONENT/ MAINTENANCE
EQUIPMENT REMARKS
NUMBER  ASSEMBLY
FUNCTION
C
O
F
H
D
REF CODE
CODE
Side Access
Inspect
0.1
2,3
A
Panel
Install
0.1
Repair
0.2
Front Panel
Inspect
0.1
1,2,3
A
Assembly
Install
2.2
Replace
4.4
Roof Door
Inspect
0.1
2,3
A
Latch
Replace
0.2
Assembly
Roof Door
Inspect
0.1
3
A
Hinge
Replace
0.8
Roof Door
Inspect
0.1
1,3
A
Assembly
Replace
0.7
Top Panel
Inspect
0.1
1,2,3
A
Assembly
Install
0.3
Replace
0.5
Wheel Well
Inspect
0.1
2,3
A
Assembly (LH
Install
0.3
and RH)
Replace
0.5
Ladder and Rail Inspect
0.1
3
A
Assembly
Replace
0.3
Side/Rear
Inspect
0.1
3
A
Marker Light
Replace
0.1
Lightbar Panel Inspect
0.1
3
A
Assembly
Replace
0.6
High Mount
Inspect
0.1
2,3
A
Stop Light
Replace
0.2
(Optional)
Tanker Module Inspect
0.1
3
A
Lighting
Replace
4.8
Harness
Assembly
0034-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.