TM 9-2320-363-34-1
5.1.
5.2.
5.3.
5.4.
5.5.
5.6.
6.
7.
N O T E
l
Perform steps 5.1 through 5.6 for M916A2, M917A1, and M917A1 w/MCS
only.
l
Same number of shims as removed must be installed, in the same location
as removed from.
POSITION SHIMS (9.1) ON BAR PINS (9.2).
USING FLOOR JACK, SUPPORT AND RAISE FRONT OF EQUALIZING BEAM (2) INTO AXLE
MOUNTING BRACKET (9.3).
INSTALL TWO NEW BOLTS (9.4), WASHERS (9.5), AND NUTS (9.6).
USING FLOOR JACK, SUPPORT AND RAISE REAR OF EQUALIZING BEAM (2) INTO AXLE
MOUNTING BRACKET (9.3).
INSTALL TWO NEW BOLTS (9.4), WASHERS (9.5), AND NUTS (9.6).
TIGHTEN TWO FRONT AND TWO REAR NUTS (9.6) TO 450-600 LB-FT (610-814 N.m).
INSTALL FOUR WASHERS (10), CROSSTUBE (11), AND SLEEVE (12).
INSTALL TWO SADDLE CAPS (13), FOUR WASHERS (14), AND FOUR NUTS (15) ON SPRING
ASSEMBLY (16). TIGHTEN NUTS TO 225-275 LB-FT (305-373 N.m).
Change 1
9-33