TM 9-2320-363-34-1
NOTE
If reinstalling axle, perform step 3. If installing new axle, perform step 4.
3.
INSTALL TORQUE ROD (8), ANY SPACER(S) (9), TWO WASHERS (10), TWO SCREWS (11), TWO
WASHERS (12), AND TWO NEW LOCK NUTS (13). TIGHTEN LOCK NUTS TO 342-434 LB-FT
(464-588 N.m).
4.
INSTALL TORQUE ROD (8), TWO WASHERS (10), TWO SCREWS (11), TWO WASHERS (12), AND
TWO NEW LOCK NUTS (13). HAND-TIGHTEN LOCK NUTS.
5.
INSTALL SPIDER ASSEMBLY (14), 16 WASHERS (15), 16 SCREWS (16), 16 WASHERS (17), AND
16 NEW LOCK NUTS (16), ON AXLE HOUSING (19). TIGHTEN LOCK NUTS TO 135-145 LB-FT
(183-197 N.m).
6.
CONNECT TWO AIR LINES (20) IN BRAKE CHAMBER (21).
NOTE
Follow-on Maintenance:
Connect equalizing beam (all except M915A2 and M916A1) (page 9-28).
If new axle was installed, adjust plane of axle (TM 9-2320-363-20).
Install rear brakeshoes and linings (TM 9-2320-363-20).
Fill axle with oil (TM 9-2320-363-20).
Change 1
6-27