TM 9-2320-363-34-1
3.
ATTACH SUITABLE HOIST AND INSTALL DIFFERENTIAL CARRIER (1), FOUR NEW LOCK
WASHERS (3), AND FOUR CAPSCREWS (4) IN FOUR CORNER LOCATIONS AROUND
DIFFERENTIAL CARRIER (1). HAND-TIGHTEN CAPSCREWS.
4.
SEAT DIFFERENTIAL CARRIER (1) AND TIGHTEN FOUR CAPSCREWS (4) IN PATTERN OPPOSITE
EACH OTHER.
5.
REPEAT STEP 4 UNTIL DIFFERENTIAL CARRIER (1) IS COMPLETELY SEATED. TIGHTEN FOUR
CAPSCREWS (4) TO 150-230 LB-FT (203-312 N.m).
6.
INSTALL EIGHT NEW LOCK WASHERS (5) AND EIGHT CAPSCREWS (6). TIGHTEN EIGHT
CAPSCREWS (6) TO 150-230 LB-FT (203-312 N.m).
NOTE
Follow-on Maintenance:
Connect intermediate driveline (TM 9-2320-363-20).
Install axle shafts (TM 9-2320-363-20).
Fill axle with oil (TM 9-2320-363-20).
Change 1
6-15