TM 9-2320-302-34
0027 00-14
ROCKER ARM ASSEMBLIES MAINTENANCE - CONTINUED
0027 00
ADJUSTMENT - CONTINUED
j.
Loosen jamnut (11) and turn adjusting screw (12) until flag (32) of injector timing height gage (30) just clears top
of fuel injector plunger (33). An accurate feel will be developed. Adjust all injectors to the same feel.
k.
Tighten jamnut (11) to 30-35 lb-ft (41-47 Nm). Check adjustment with injector timing height gage (30) and, if nec-
essary, readjust.
l.
Remove injector timing height gage (30).
m.
Refer to adjusting sequence, Table 1, and proceed to next cylinder in adjustment sequence.
n.
Bar engine over in direction of normal rotation until next cylinder in adjustment sequence is in its valve overlap
period.
o.
Repeat valve adjustment and fuel injector height adjustment procedures until all valves and injectors have been
adjusted.
2.
Install engine retarder (WP 0022 00).
END OF WORK PACKAGE
33
12
11
30
32