COMPRESSED AIR SYSTEM.
9-15. SUPPLY RESERVOIR CHECK VALVE MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a. Removal.
(4)
b. Testing.
(2)
c. Installation.
(4)
d. Operational Check.
(4)
14 Minutes Total.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
All.
9-13A.
Primary Air Reservoirs
TEST EQUIPMENT
Drained.
None.
SPECIAL TOOLS
MATERIALS/PARTS (P/N)
Liquid Teflon (Refer to Appendix C).
Controllable Shop Air Supply.
Air Pressure Gage.
PERSONNEL REQUIRED
One (MOS-63B20).
REFERENCES (TM)
TM 9-2320-273-10.
TM 9-2320-273-20P.
TROUBLESHOOTING REFERENCES
Table 9-1.
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Parked on Level Ground.
GENERAL SAFETY INSTRUCTIONS
Engine Off.
Transmission in Neutral.
Park Brake Set.