TM 9-2320-273-20
STARTING AND STARTING CONTROL.
Aline lock cylinder (7)
and press into switch.
Aline and insert in
instrument panel.
Install and tighten.
Install on switch.
Raise into place.
Tighten.
Connect per paragraph 37B.
5-35. ENGINE RUN SWITCH MAINTENANCE (Continued).
LOCATION/lTEM
ACTION
REMARKS
B. INSTALLATION.
7. ENGINE RUN switch (5).
8. ENGINE RUN switch (5).
9. Hex nut (8).
10. Wire connector (4) and
wires (3).
11. Hinged instrument panel (2).
12. Four quarter-turn screws (1).
13. Batteries.
C. OPERATIONAL CHECK.
14. Engine
Start up (see TM 9-2320-273-10). Verify that
all circuits are operational.
5-106