TM 9-2320-273-20
STEERING AND ALINEMENT.
10-23. AUXILIARY CYLINDER (M916 THRU M920) (Continued).
LOCATION/lTEM
ACTION
REMARKS
C. INSTALLATION (Continued).
40. Two hose retainers (7).
Place over lines (6) and (13)
and secure to bracket (9) with
bolt (8), Iockwasher (10), and
nut (12).
41. Two new cable ties (11).
Install around two lines (6) and
(13) and front cross frame tube.
42. Cylinder (5).
Lubricate with GAA at two ball
joint grease fittings as shown.
43. Power steering fluid level.
Check (refer to LO 9-2320-273-12).
NOTE
Follow on maintenance action required: Install
fender; refer to paragraph 11- 14D.
D. OPERATIONAL CHECK.
44. Engine.
Start up.
Refer to TM 9-2320-273-10.
45. Wheels.
Turn all the way to left and to
right.
46. Cylinder (5), line (6)
Check for leaks.
Tighten as necessary.
and line (13).
47. Engine.
Shut down.
Refer to TM 9-2320-273-10.
10-102