TB 9-2320-360-13&P-1
INITIAL INSTALLATION INTRODUCTION
This chapter contains step-by-step procedures for installing the HET Tractor A/C and stowage box kits.
INSTALLATION PROCEDURE
The initial installation procedure for the A/C system is divided into A/C Kit Installation (WP 0003 00) and Stowage Box
Installation (WP 0004 00). These work packages can be performed in any order without affecting the other. Both kits must be
installed to complete the A/C system installation.
END OF WORK PACKAGE