TB 9-2320-302-13&P-2
UNDERBODY MINE BLAST PANEL REPLACEMENT - CONTINUED
0017 00
INSTALLATION - CONTINUED
14.
Install two washers (2) and new locknuts (3) on rear cab mounts (1).
1
1
2
2
3
2
3
440-014
15.
Install air cleaner and intake duct hosing. For the M915A3P1, M916A3P1, and M917A2P1, refer to TM 9-2320-302-20-
2. For the M915A4P1, refer to TM 9-2320-303-24-1. For the M915A2P1, M916A1P1, M916A2P1, and M917A1P1,
refer to TM 9-2320-363-20-2.
16.
Install transmission shift tower. For the M915A3P1, M916A3P1, and M917A2P1, refer to TM 9-2320-302-20-2. For the
M915A4P1, refer to TM 9-2320-303-24-1. For the M915A2P1, M916A1P1, M916A2P1, and M917A1P1, refer to TM
9-2320-363-20-2.
17.
Install right and left seats. For the M915A3P1, M916A3P1, and M917A2P1, refer to TM 9-2320-302-20-2. For the
M915A4P1, refer to TM 9-2320-303-24-1. For the M915A2P1, M916A1P1, M916A2P1, and M917A1P1, refer to TM
9-2320-363-20-2.
END OF WORK PACKAGE
0017 00-17/(0017 00-18 Blank)